Thriam
OEM Play Store
CTCI MAC completes 117 Pin Piles Ahead of Schedule for CFXD Offshore Wind Farm in Taiwan

CTCI MAC completes 117 Pin Piles Ahead of Schedule for CFXD Offshore Wind Farm in Taiwan

By December 15, 2021 3:52 pm IST

 117 pin piles contracted by CTCI MAC among 186 needed at the wind farm have been completed up to quality standard.

CTCI Machinery Corporation, the manufacturer of pin piles for the 600 MW, 62-turbine Changfang & Xidao Offshore Wind Farm off central coast of Taiwan, has completed the manufacture and acceptance of second batch of 69 pin piles in November, one month ahead of schedule. Previously in June this year, the first batch of 48 pin piles has been delivered, also ahead of schedule by 1.5 months. In all, 117 pin piles contracted by CTCI MAC among 186 needed at the wind farm have been completed up to quality standard.

Developed by Copenhagen Infrastructure Partners, CFXD Offshore Wind Farm commits to the highest localisation level amongst all projects in Taiwan. This pin pile fabrication contract award marks the largest contract in terms of the number of pin piles manufactured by a single company in Taiwan. CTCI MAC has exhibited superb expertise and supply capability.

Advertising

Your future advertising space? Our media data

Dennis Sanou, CEO of CFXD Offshore Wind Farm says, that CTCI MAC has made an early delivery of the pin piles awarded to them for fabrication. He comments, “Not only did CTCI MAC meet our requirements on quality, pricing, and delivery timeline, they are a leading local supplier that gives significant attention to keeping high HSE (health, safety, and environment) standards, and maintains high level of professionalism in contract execution.”

Yun-Peng Tan, Chairman of CTCI MAC, appreciates CFXD Project’s full support and assistance and states, “Through a series of learning opportunities and customer verification processes in this project, we have not only gradually mastered key technologies and know-how of the industry, but have also gained experience and built track records. By adopting multiple submerged arc-welding machines simultaneously, we were able to greatly cut manufacturing time and increase both efficiency and quality. We will stay committed to supporting localisation of Taiwan’s offshore wind power industry.”

For more info, visit: http://www.ctci.com

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags: News
webinar

Do you want to advertise here? Contact us

Mototech25 Pune

Events

LWOP
IFAT India 2025
India Manufacturing Show
4th IFFE EXPO 2025
Auto EV Bharat 2025
Laser Engineering Technology Expo
Factory Automation Expo 2025
Clean India Show 2025
17th ENGIMACH 2025
Mobility Manufacturing & Materials Expo (3ME) 2026

eMagazine September 2025

eMagazine September 2025

Do you want to advertise here? Contact us

Our Sponsors

Cloos
Pragati Gears
Pilz India
Carl Zeiss India
Atos Profilo
Maco-c
Inovance Technology
igus
Delta Electric
Libratherm instruments
Cumi
Vega India Level Ltd
Marvel Machinery
Wago Pvt Ltd
Dosatron
Super Slides
Bohler
Precihole
Magnets India
Tecnicum
IMTMA- IMTEX 24
Sdtronics
Jumo
Ruby-Mica
Compucare
Gloster
TASA
CJ-Darcal
Walter
Creative Engineers
ACE Micromatic Group
Octagon Manufacturing Technology
Profectus
Blum Novotest
HMS
Accu Sharp
CS Instruments
Spac
Chicago Pneumatic Tools
Nangal
Mennekes
ACD Machines
MARPOSS
phoenixcontact
Shree Rapid
Balluff
EAPL
Amsak Cranes
J K Machines
Exorint