OEM Update
.

Reverse Osmosis [Jan 2012]

January 11, 2012 5:56 am

This article is intended to help OEMs and utility engineers have an in-depth analysis of the their RO system and take necessary modification steps to achieve efficiency in operations that not only pays back for the modification, reduces the overall plant life cycle cost
In the reverse osmosis applications for Brackish water treatment to make the water fee of dissolved solids, the design and selection of right plant has been of immense importance. A lot has been written and there are available tools and guidelines to build a system. The optimisation of the plants in actual field conditions and cares to take throughout its life and upgrade the design based on latest knowhow, however, still is the area that’s neglected a lot – especially in the absence of a systematic guideline to approach modification of an existing facility.
Introduction to reverse osmosisReverse osmosis is a process of filtration of ions through a very fine material know as membrane. When we make this membrane ultra fine that to filter out ionic substances in their hydrated form, it becomes selectively permeable. This means it allows water to pass but salt (in its hydrated form) is not allowed to pass.
Another form of science also applies here in case we try for ionic filtration. The phenomena of Osmosis, which will encourage the water already filtered through membrane (pure water), reverse its flow towards the rejected salt so that the concentration of salt is reduced.
Since the objective of reverse osmosis is to achieve filtration of ions and produce salt free water, feed water pressure therefore shall be enough to overcome two barriers:
Resistance of membranes
Flow of pure water back to the concentrated side.
In scientific term therefore the applied pressure is greater than the osmotic pressure plus the membrane resistance.
Applied pressure depends upon water to be filtered, for lower TDS of bore-well water pressure is low (7 – 18 kg/cm2) and for higher TDS water such as sea water the pressure is very high > 40 kg/cm2.
Reverse osmosis thus generates a pure water stream (product) and a concentrated water stream (reject) when we feed a raw water stream with pressure into a reverse osmosis system:The inputs for RO designTo design a Reverse osmosis system, the designer can have only 2 objectives of a design:
Lower capital cost
Lower operating expense.
Actually one needs to have a third basis of design i.e. plant life cycle cost, but it is ignored in early stages of RO plant development for lack of data and trends available before hand for design. Things have however changed over past several years and a lot of operational experience is now available which can be used for plant retrofit and modernisation.
But let’s first have a look at the elements on which the plants are designed. They are here in order of their impact on the decision made:
Feed water TDS (ionic composition)
Recovery desired
Membrane selection
Pump selection
Array design and optimisation
Automation and control.
And off-course present and future needs to arrive at the capacity of the plant.
Is my plant healthy?This question is often popped to me when I meet RO plant users. In majority of the cases, once the plant is thoroughly audited we find a sincere need to re-invest and I mean, mind here not the money as a matter of priority. Let me first share some of the concern:
The Pump head The high pressure pump (HPP) that generates pure water at specified recovery and for a specified feed, is one place that contributes to maximum operating expense in form of power. At the beginning of a Greenfield project what we normally do:
Customer: Provides worse water analysis of the season to the plant designers (off-course that’s logical)
Customer: We keep 20-25 per cent safety on it thinking that water quality may deteriorate with time.
OEM: Will take 5-10 per cent safety in commitment on pressure, in comparison to what has been indicated by membrane designed software e.g. ROSA from Dow.
Consultant: Depending upon the case, he may recommend keeping 10 per cent margin on the pump head as a general rule of good engineering practice.
OEM: Since the RO membranes foul with time, we have drop in flux progressively. That means brand new membranes will need low pressure compared to the membranes that are fouled. Therefore, if the plant membrane life is estimated for 3 years, the pressure of pump selected would be about 20 – 25 per cent higher, to ensure that the plant is functional even at the end of 3rd year.
OEM: Considering all above, one will arrive at bkw and it’s natural to take the next available size of the motor to ensure compliances.
OEM: Reverse osmosis systems operate on pre-treated water and usually feed water at inlet of HPP shall have 1.00 – 2.00 Kg/cm2 pressure. Since the modern HPP are inline vertical stage pumps, this pressure is available to be added to further system, but is usually ignored.
And the cumulative effect of such efforts is a pump designed anywhere between 50 – 80 per cent margin over its duty condition at the start of the plant. Choice of MembraneUsually a very good guide is available from membrane suppliers about membrane selection. It largely depends upon three factors:
Flow rate: It is suggested to use 4” membrane for plants upto 2.3 m3/h and 8” for higher flow rates.
Feed Quality: Depending upon the feed the choice of FR (Fouling Membranes) or HR (High Rejection) is available
Energy Efficiency: Depending upon the end TDS desired, one can select a LE (low energy membrane) to save energy.
Besides, the membrane in same sizes are available with different area e.g. 8” membrane is available with 365, 400 and 440 sq.ft. area.
Myth: is that low energy membrane results in poor treated water quality. Plant optimisation keeping in mind the end water quality, recovery and scaling potential is a designer’s job and can be done if one is willing to take that extra effort to aim at “Life Cycle Cost” of the plant and also explain the benefits of such schemes.
Unfortunately, for a Greenfield project the decision are usually conservative as the field data or history is not available. Further, most of the time, the selection of membrane by OEM depends upon the membrane inventory available with OEM.
Spot an Opportunity?The energy efficiency issues can be easily factored in during plant design by simply incorporating a VFD for high pressure pump. In most cases the investment pays off in less than a year. However, it is not the end of the efforts and one gets an opportunity to have a hard look at its plant health at the time of membrane replacement for the next time.A scientific approach is thus needed and therefore it is important to register:
Current water analysis vis-à-vis design analysis.
Seasonal variations
Water demand data with peak and lean period properly defined.
Treated water quality; is it too good? Can you afford slight deterioration in it without effecting process?
Fouling trends and effectiveness of cleaning
Cartridge filter pressure drop and replacement trends
Energy consumption Rs./m3
Recovery – design, normal, average
Antiscalant consumption with regard to recovery
Any physical damage to membrane, o-rings.
A good utility manager shall keep proper records of these for 3 years and will have an idea post his study about his need for future. My experience suggests that almost all plants need a re-design approach to achieve one of the followings:
Energy efficiency
Higher production or recovery
Better quality
Reduced down time – increased plant availability.
A recent development in membrane inter-connection with interlocking end caps has greatly reduced the risk of o ring failure and has improved upon plant availability.
A Responsible Act?Utility mangers and the engineer responsible to recommend a membrane replacement have therefore a big responsibility on them to re-think the design of their plant based on the current needs and the histogram of the actual operation.
The three efforts that can easily go into a new design are:
Right selection of new membranes
Incorporation of a VFD in high pressure pump
Optimum use of Antiscalant.
And these efforts shall be beneficial to the plant performance and optimum expenses for the rest of the life of the plant.
But beware! The next 3-4 years should not be ignored as new products are continuously being developed.

Cookie Consent

We use cookies to personalize your experience. By continuing to visit this website you agree to our Terms & Conditions, Privacy Policy and Cookie Policy.

Tags:
OEM Update QR Code
OEM Update QR Code

Events

Intralogistics and Warehousing Expo
Intralogistics and Warehousing Expo
Metal Forming Expo
Metal Forming Expo
amtex
amtex
Fastener Fair India
Fastener Fair India
Himtex 2024
Himtex 2024
Pharma India Expo
Pharma India Expo
World of Photonics India
World of Photonics India
IFFE Expo
IFFE Expo
India Essen Welding and Cutting Expo
India Essen Welding and Cutting Expo

eMagazine April 2024

eMagazine April 2024
eMagazine April 2024

Your future advertising space? Our media data

Our Sponsors

Carl Zeiss India
Carl Zeiss India
STMCNC
STMPC
Lakshmi Machine Works Limited
Lakshmi Machine Works Limited
BR Automation
BR Automation
Pragati Gears
Pragati Gears
Pilz India
Pilz India
Fuji Electric India
Fuji Electric India
Testo-India
Testo-India
AMF
AMF
Bibus India
Bibus India
Mallcom
Mallcom
HPL Electric Power
HPL Electric Power
PMT Machines Ltd
PMT Machines Ltd
Igus India Pvt Ltd
Igus India Pvt Ltd
Sdtronics
Sdtronics
Vega India Level Ltd
Vega India Level Ltd
Wago Pvt Ltd
Wago Pvt Ltd
Mecc alte
Mecc alte
Hosabettu Heavy Machinery LLP
Hosabettu Heavy Machinery LLP
Chicago Pneumatic Tools
Chicago Pneumatic Tools
Concord Hydraulics
Concord Hydraulics
Fenwick and Ravi
Fenwick and Ravi
MMC Hardmetal Pvt Ltd
MMC Hardmetal Pvt Ltd
Radicon Powerbuild
Radicon Powerbuild
Mennekes
Mennekes
Red Lion
Red Lion
EAPL
Red Lion
Endress Houser
Endress Houser
Premium
Premium
KEJE Electric
KEJE Electric
Sterling Engineering
Sterling Engineering
Fietest
httpswww.fietest.com
J K Machines
J K Machines
Filtermist
Filtermist
Exor
Exor
IMTMA
IMTMA
Prostarm
Prostarm
Wika Instruments India
Wika Instruments India